Trenching and Excavation

This SWMS includes detailed:

  • Risk assessment
  • Hierarchy of controls\planning and preparation
  • Labour selection
  • Identification of essential Services
  • Preparation of Work Area
  • Plus, many more safety controls measures listed

$45.00

Additional information

Related Products

Performance Advantage have a wide range of document and reference material available for purchase. We can also tailor any document to suit your requirements.

Front End Loader Use

Safe Work Method Statement for the use of a Front End Loader

$45.00

SWMS – Lower Roof Walkway Installation

Safe Work Method Statement for installing a Lower Roof Walkway

$45.00

SWMS – Driving

Safe Work Method Statement for Driving

$45.00

SWMS – Bobcat-Excavator Operation

Safe Work Method Statement for Bobcat-Excavator Operation

$45.00