Residential Builder SWMS Package

Detailed SWMS for:

  • Angle Grinder
  • Asbestos Removal
  • Bobcat – Excavator
  • Carpentry
  • Demolition
  • Driving
  • Front End Loader
  • Jigsaw
  • Lower Roof Walkway Installation
  • Manual Handling
  • Operating a Reciprocal Saw
  • Mobile Plant
  • Painting
  • Panel Saw
  • Power Tools
  • Roof Installation
  • Scaffolding
  • Unloading Bobcat from Float
  • Excavator
  • Nail Gun
  • Pedestal Drill
  • Ladder
  • Wall Cladding
  • Working at Heights
  • Working near powerlines
  • Working on Elevated Platforms
  • Working on trestles

$675.00

Additional information

Related Products

Performance Advantage have a wide range of document and reference material available for purchase. We can also tailor any document to suit your requirements.

Front End Loader Use

Safe Work Method Statement for the use of a Front End Loader

$45.00

SWMS- Forklift Use

Safe Work Method Statement for operating a Forklift

$45.00

SWMS – Coffee Machine Usage

Safe Work Method Statement for using a coffee machine in a bakery or cafe.

$45.00

SWMS – Handling Bags of Ingredients

Safe Work Method Statement for Handling of Bags of Ingredients in a food service or manufacturing setting.

$45.00