SWMS – Demolition Works

This SWMS includes detailed:

  • Risk assessment
  • Hierarchy of controls
  • Pre-demolition planning
  • Pre-demolition inspection for asbestos materials, hazardous substances, lead, dangerous goods, PCB’s synthetic mineral fibres,
  • Underground services review (gas, electrical etc)
  • Plus, many more safety controls measures listed

$45.00

Additional information

Related Products

Performance Advantage have a wide range of document and reference material available for purchase. We can also tailor any document to suit your requirements.

SWMS – Pedestal Drill

Safe Work Method Statement for the use of a Pedestal Drill

$45.00

SWMS – Lower Roof Walkway Installation

Safe Work Method Statement for installing a Lower Roof Walkway

$45.00

Packing and Inspecting Food Products

Safe Work Method Statement for packing and inspecting products in a food service or manufacturing setting.

$45.00

SWMS – Bread Slicer Machine

Safe Work Method Statement for using a bread slicer machine in a food service or manufacturing setting.

$45.00