SWMS – Demolition Works

This SWMS includes detailed:

  • Risk assessment
  • Hierarchy of controls
  • Pre-demolition planning
  • Pre-demolition inspection for asbestos materials, hazardous substances, lead, dangerous goods, PCB’s synthetic mineral fibres,
  • Underground services review (gas, electrical etc)
  • Plus, many more safety controls measures listed

$30.00

Additional information

Related Products

Performance Advantage have a wide range of document and reference material available for purchase. We can also tailor any document to suit your requirements.

SWMS – Mobile Plant

Safe Work Method Statement for using Mobile Plant

$30.00

SWMS – Operating a Reciprocal Saw

Safe Work Method Statement for the operation of a Reciprocal Saw

$30.00

SWMS – Pedestal Drill

Safe Work Method Statement for the use of a Pedestal Drill

$30.00

Front End Loader Use

Safe Work Method Statement for the use of a Front End Loader

$30.00