Building & Construction Industry SWMS Package

Detailed SWMS for: –

  • Driving
  • Drill – battery type
  • Demolition works
  • Carpentry
  • Bobcat – Excavator
  • Assessing Negotiator Notifier
  • Asbestos
  • Angle Grinder
  • Working on Elevated Platforms
  • Working Near Powerlines
  • Working at Heights
  • Wall Cladding Works
  • Using Ladders
  • Use of Nail gun
  • Use of Excavator
  • Use of Oxy (oxyacetylene) Welder
  • Use of Two-way Radio
  • Unloading a Bobcat from Float
  • Scaffolding
  • Roof Installation
  • Power Tools
  • Pedestal Drill
  • Operating a Reciprocal Saw
  • Mobile Plant
  • Manual Handling
  • Lower Roof Walkway Installation
  • Front End Loader Use
  • Forklift
  • Jigsaw

$756.00

Additional information

Related Products

Performance Advantage have a wide range of document and reference material available for purchase. We can also tailor any document to suit your requirements.

Front End Loader Use

Safe Work Method Statement for the use of a Front End Loader

$45.00

SWMS – Driving

Safe Work Method Statement for Driving

$45.00

SWMS – Grill & Hotplate Usage

Safe Work Method Statement for using a grill plate or hotplate in a food service or manufacturing setting.

$45.00

SWMS – Coffee Machine Usage

Safe Work Method Statement for using a coffee machine in a bakery or cafe.

$45.00