SWMS – Jack Hammer (electric)

This SWMS includes detailed:

    • Risk assessment
    • Hierarchy of control
    • Planning and Preparation
    • Drilling Concrete
    • Refueling
    • Signoff

$45.00

Additional information

Related Products

Performance Advantage have a wide range of document and reference material available for purchase. We can also tailor any document to suit your requirements.

SWMS – Lower Roof Walkway Installation

Safe Work Method Statement for installing a Lower Roof Walkway

$45.00

SWMS – Bobcat-Excavator Operation

Safe Work Method Statement for Bobcat-Excavator Operation

$45.00

SWMS – Food Prep & Kitchen Duties

Safe Work Method Statement for food preparation and kitchen duties in a food service or manufacturing setting.

$45.00

SWMS – Adding Liquid Ingredients

Safe Work Method Statement for adding liquid ingredients

$45.00