SWMS Carpentry

This SWMS includes detailed:

  • Risk assessment
  • Hierarchy of controls
  • Unloading equipment, materials, frames, trusses
  • Placing of materials / frames/trusses on ground
  • Erecting 1st storey house frames, sheet flooring, wall frames,
  • Plus, many more safety controls measures listed

$45.00

Additional information

Related Products

Performance Advantage have a wide range of document and reference material available for purchase. We can also tailor any document to suit your requirements.

SWMS – Lower Roof Walkway Installation

Safe Work Method Statement for installing a Lower Roof Walkway

$45.00

SWMS – Driving

Safe Work Method Statement for Driving

$45.00

SWMS – Oven Usage

Safe Work Method Statement for using an oven in a food service or manufacturing setting.

$45.00

SWMS – Adding Liquid Ingredients

Safe Work Method Statement for adding liquid ingredients

$45.00