Building & Construction Industry SWMS Package

Detailed SWMS for: –

  • Driving
  • Drill – battery type
  • Demolition works
  • Carpentry
  • Bobcat – Excavator
  • Assessing Negotiator Notifier
  • Asbestos
  • Angle Grinder
  • Working on Elevated Platforms
  • Working Near Powerlines
  • Working at Heights
  • Wall Cladding Works
  • Using Ladders
  • Use of Nail gun
  • Use of Excavator
  • Use of Oxy (oxyacetylene) Welder
  • Use of Two-way Radio
  • Unloading a Bobcat from Float
  • Scaffolding
  • Roof Installation
  • Power Tools
  • Pedestal Drill
  • Operating a Reciprocal Saw
  • Mobile Plant
  • Manual Handling
  • Lower Roof Walkway Installation
  • Front End Loader Use
  • Forklift
  • Jigsaw

$756.00

Additional information

Related Products

Performance Advantage have a wide range of document and reference material available for purchase. We can also tailor any document to suit your requirements.

Front End Loader Use

Safe Work Method Statement for the use of a Front End Loader

$45.00

Packing and Inspecting Food Products

Safe Work Method Statement for packing and inspecting products in a food service or manufacturing setting.

$45.00

SWMS – Handling and Removing Product from Trays, Racks or Tins

Safe Work Method Statement for Handling and Removing Product from Trays, Racks or Tins in a food service or manufacturing setting.

$45.00

SWMS – Handling Bags of Ingredients

Safe Work Method Statement for Handling of Bags of Ingredients in a food service or manufacturing setting.

$45.00