Carpentry
Carpentry
This SWMS includes detailed:
- Risk assessment
- Hierarchy of controls
- Unloading equipment, materials, frames, trusses
- Placing of materials / frames/trusses on ground
- Erecting 1st storey house frames, sheet flooring, wall frames,
- Plus, many more safety controls measures listed
$45.00
Additional information
Related Products
Performance Advantage have a wide range of document and reference material available for purchase. We can also tailor any document to suit your requirements.
SWMS – Operating a Reciprocal Saw
Safe Work Method Statement for the operation of a Reciprocal Saw
$45.00
SWMS – Pedestal Drill
Safe Work Method Statement for the use of a Pedestal Drill
$45.00
SWMS – Coffee Machine Usage
Safe Work Method Statement for using a coffee machine in a bakery or cafe.