SWMS – Electrical Work – Rough In
SWMS – Electrical Work – Rough In
This SWMS includes detailed: –
- Risk
- Hierarchy of controls
- Installation of site power
- Switchboards
- Concrete drilling, cutting or chasing
- And much more…..
$45.00
Additional information
Related Products
Performance Advantage have a wide range of document and reference material available for purchase. We can also tailor any document to suit your requirements.
Front End Loader Use
Safe Work Method Statement for the use of a Front End Loader
$45.00
SWMS – Filling and Weighing of Bags, Sacks and Jars
Safe Work Method Statement for filling and weighing of bags, sacks and jars in a food service or manufacturing setting.
$45.00
SWMS – Handling and Removing Product from Trays, Racks or Tins
Safe Work Method Statement for Handling and Removing Product from Trays, Racks or Tins in a food service or manufacturing setting.