SWMS – Pallet Jack

This SWMS includes detailed:

    • Risk assessment
    • Hierarchy of control
    • Planning and Preparation
    • Equipment Check
    • Using Pallet Jack
    • Signoff

$45.00

Additional information

Related Products

Performance Advantage have a wide range of document and reference material available for purchase. We can also tailor any document to suit your requirements.

Front End Loader Use

Safe Work Method Statement for the use of a Front End Loader

$45.00

Battery Drill

Safe Work Method Statement for using a battery operated drill

$45.00

SWMS – Bobcat-Excavator Operation

Safe Work Method Statement for Bobcat-Excavator Operation

$45.00

SWMS – Bread Slicer Machine

Safe Work Method Statement for using a bread slicer machine in a food service or manufacturing setting.

$45.00