SWMS – Pallet Jack
SWMS – Pallet Jack
This SWMS includes detailed:
-
- Risk assessment
- Hierarchy of control
- Planning and Preparation
- Equipment Check
- Using Pallet Jack
- Signoff
$45.00
Additional information
Related Products
Performance Advantage have a wide range of document and reference material available for purchase. We can also tailor any document to suit your requirements.
Front End Loader Use
Safe Work Method Statement for the use of a Front End Loader
$45.00
SWMS – Bobcat-Excavator Operation
Safe Work Method Statement for Bobcat-Excavator Operation
$45.00
SWMS – Bread Slicer Machine
Safe Work Method Statement for using a bread slicer machine in a food service or manufacturing setting.